施工方法:
確認待涂膠地坪必須清潔、干燥、光滑,水泥地面不起沙.
建議用A2/A3鋸齒刮刀均勻涂刮,待膠晾至透明,至用手
指觸摸判斷(時間約10-20分鐘)即可鋪設地板材料.
鋪下地板后,用木板滾筒滾壓以排除因入的空氣確保膠水全
部粘接到地板背面.
Construction ways:
1.Make sure the floor is clear,dry,smooth and having no sands.
2.please use A2/A3 sawtooth cutter to spread glue. After open time 10-20min,the glue is dry.Then the substrace is ready to lay floors.
3.After the flooring material is applied on the substrace,rub the surface by wood roller to dremove entranced air under the floor.
理論涂布量:每公斤涂布7-9平方米
Theoretical Application Rate:one kilogram glue for 7-9 square meters.
注意事項:本產品儲存溫度為5-35℃,應密閉儲存,防止強光照射并注意防凍,本產品屬于非危險品。
Warnings:The best storing temperature for our product is 5prefix = st1 ns =